Read the following message.
Dear Nadia, I've been meaning to write ever since you asked about our basement renovation. Things have been mLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.
1. Miranda is writing to Nadia to .....
ask for advice about her renovation.
update her on the basement project.
complain about the contractor's work.
invite her to move into the new suite.
2. The project fell behind schedule because .....
the plumber took too long to install the bathroom.
the city delayed issuing the building permit.
damage was found behind the walls.
a second egress window had to be installed.
3. Miranda was impressed by .....
how quickly Sam completed his work.
the size of the new kitchenette.
Derek's original cost estimate.
the city inspector's helpfulness.
4. Kevin went to the municipal office to .....
file a complaint about the contractor.
arrange for a second egress window.
hire a building inspector.
deal with permit paperwork.
5. Miranda added spray foam insulation because .....
the building inspector required it.
Nadia had shared advice about it.
Kevin wanted to reduce heating costs.
Derek recommended it after finding water damage.
6. Miranda most likely feels that the renovation .....
was worth the extra trouble.
went mostly according to plan.
should have been done differently.
was too expensive to justify.
Here is a response to the message. Complete the response by filling in the blanks. Select the best choice for each blank.
Dear Miranda, What a 7...... update! I'm glad you and Kevin decided to keep going despite the setback with the water damage. It sounds like hiring Derek was a 8...... decision overall, especially since he found that foundation issue before it got worse. And I'm happy to hear that 9...... worked out so well — getting the plumbing done in four days is remarkable. I had no idea you actually followed my cousin's advice about 10....... That really does make a difference in older basements. As for Boxing Day, count me in! I was already planning to drive to Edmonton over the holidays, so the timing is 11....... I cannot wait to see the finished suite. Talk soon, Nadia